Wednesday, Dec 25, 2024
English News
  • Hyderabad
  • Telangana
  • AP News
  • India
  • World
  • Entertainment
  • Sport
  • Science and Tech
  • Business
  • Rewind
  • ...
    • NRI
    • View Point
    • cartoon
    • Columns
    • Olympics
    • Education Today
    • Reviews
    • Property
    • Lifestyle
E-Paper
  • NRI
  • View Point
  • cartoon
  • Columns
  • Reviews
  • Education Today
  • Property
  • Lifestyle
Home | News | Ntpc Announces Commercial Operation Of Stpp Unit 2

NTPC announces commercial operation of STPP Unit-2

The unit produced more than 800 MW power. With the completion of the trail run, NTPC officials prepared plans for commercial operation declaration (COD) and announced it at midnight.

By Telangana Today
Published Date - 29 February 2024, 07:53 PM
NTPC announces commercial operation of STPP Unit-2
whatsapp facebook twitter telegram

Peddapalli: The National Thermal Power Corporation Limited (NTPC) has announced the commercial operation of Unit-2 (800 MW) of the Telangana Super Thermal Power Project (STPP), Stage-I (2X800 MW) with effect from midnight on Friday.

Unit-2’s 72 hours trial operation, which was started on February 8, was successfully completed at 11.02 am on February 12. The unit produced more than 800 MW power. With the completion of the trail run, NTPC officials prepared plans for commercial operation declaration (COD) and announced it at midnight.

Also Read

  • Telangana: Burglars decamp with Rs 27.75 lakh from ATM in Godavarikhani
  • Telangana: NTPC ED praises participants of Girl Empowerment Mission 2023

It may be recalled here that the Unit-1 (800 MW) of TSPS Phase-I started commercial production in September, 2023. Prime Minister Narendra Modi dedicated the unit-I to the nation through virtual mode from Nizamabad on October 3 last year.

Established as per the provisions of the Andhra Pradesh Reorganisation Act, 2014, the 5×800 MW (4,000 MW) supercritical thermal power plant is mandated to supply 85% of the energy generated there to Telangana.

The Telangana Government has made a formal request to the NTPC and Ministry of Power to allocate 100% of the power generated there to meet the increasing demand for energy in the State, but a decision is yet to be taken on it.

Since ultra-supercritical technology is used, the plant has several environment-friendly fuel-efficient features with improved cycle efficiency of 42 per cent, a unified control system and control room, gas insulated sub-station, installation of roof-top solar panels on all plant buildings, highly concentration slurry disposal system for water conservation and flue gas desulphurisation (FGD) for SOX reduction.

With the successful commissioning of Unit-2, the standalone installed capacity of NTPC reaches an impressive 58,638 MW. Furthermore, in the group category, NTPC’s commercial capacity reaches 74,758 MW.

  • Follow Us :
  • Tags
  • Andhra Pradesh Reorganisation Act
  • NTPC
  • Telangana Super Thermal Power Project

Related News

  • Longstanding Telangana- AP Krishna water dispute takes a new turn

    Longstanding Telangana- AP Krishna water dispute takes a new turn

  • Kavitha demands Congress to pressurise Centre to establish Bayyaram Steel Plant

    Kavitha demands Congress to pressurise Centre to establish Bayyaram Steel Plant

  • Telangana’s installed power capacity to touch record 25,000 MW by May

    Telangana’s installed power capacity to touch record 25,000 MW by May

  • Telangana’s 1,000 MW solar plant tenders designed to ‘favour’ big players like Adani

    Telangana’s 1,000 MW solar plant tenders designed to ‘favour’ big players like Adani

Latest News

  • Save future of Telangana NEET PG aspirants, IMA writes to CM Revanth Reddy

    19 mins ago
  • Telangana techie loses Rs 4.15 lakh to online gold trading fraud

    49 mins ago
  • Hyderabad: Couple working as house help at doctor’s residence held for theft

    1 hour ago
  • Hyderabad auto driver foils attempt to kidnap young woman, five held

    2 hours ago
  • Haiti gang attack on journalists covering hospital reopening leaves 2 dead, several wounded

    3 hours ago
  • 21 dead as Mozambique erupts in violence after election court ruling

    3 hours ago
  • Cartoon Today on December 25, 2024

    11 hours ago
  • Sandhya Theatre stampede case: Allu Arjun questioned for 3 hours by Chikkadpallly police

    12 hours ago

company

  • Home
  • About Us
  • Contact Us
  • Contact Us

business

  • Subscribe

telangana today

  • Telangana
  • Hyderabad
  • Latest News
  • Entertainment
  • World
  • Andhra Pradesh
  • Science & Tech
  • Sport

follow us

© Copyrights 2024 TELANGANA PUBLICATIONS PVT. LTD. All rights reserved. Powered by Veegam